Laserfiche WebLink
Table C-1: Pit 1 Mining Timetable <br /> Weimer Ranches#4 <br /> Year Gravel Stage <br /> (tons) <br /> 2 20,000 1 <br /> 4 20,000 1 <br /> 6 20,000 1 and 2 <br /> f 8 20,000 2 <br /> 10 20,000 2 and 3 <br /> ---- 20,000 ---- 1 3-- - -- <br /> 14 20,000 3 <br /> r 16 20,000 3 and 4 <br /> 18 20,000 4 <br /> 2;00- 20,000 4 <br /> j Total 200,000 _---- -The gravel deposit will be excavated via bulldozer and front-end loader and either directly fed <br /> into the processing plant or placed within a dump truck for transport to the processing area in the <br /> northwest corner of the site. Excavation will proceed to final mine slopes and grades of 3H:1 V or <br /> shallower(Map E-3),thus it is anticipated that minimal to no backfilling with overburden will <br /> occur during reclamation. Reclamation will occur for each Stage once mining is complete in that <br /> Stage. <br /> No explosives will be used. <br /> The primary commodities marketed from mining and processing operations at the site are sand <br /> and gravel products, both screened and crushed. Overburden removed from above the gravel <br /> deposits may be removed and sold as embankment fill material from time to time as market <br /> demand occurs. <br /> 2. Mining Timetable <br /> The life of the mine is anticipated to not extend beyond 20 years from the start of mining. Exact <br /> timing will be based on market conditions. Mining is planned to begin in the spring/summer of <br /> 2021. <br /> Weimer Ranches #4 <br /> June 2021 C-2 <br />