_M� <br /> CX R4Y"_5LVER A41NES <br /> used and references equipment size of an 8 in internal diameter. All <br /> information including construction drawings for the Reagent <br /> Building indicate that thepiping system will consist of 2 inch or <br /> smaller diameter piping. Please clarify why this form was included <br /> and what its applicability is to the Reagent Building. <br /> b. Sheet 100-SS <br /> i. Please commit to retaining and submitting all QA/QC <br /> documentation for each respective phase of construction as it is <br /> completed. These should beprovided in addition to the as built <br /> drawings and certifications for the components it applies to. <br /> c. QA/QC criteria is given in several different documents throughout the <br /> revision. For ease of reference, please submit a table of all QA/QC tests to <br /> be conducted during construction, including the location or phase, success <br /> criteria,the results of each test and a"Pass/ Fail" indication. This running <br /> table can be used as a summary table, to be submitted with full <br /> documentation of the QA/QC tests as anappendix to the Table. This will <br /> allow the Operator and the Division to actively track all QA/QC tests <br /> effectively and clearly. <br /> Response: <br /> a. <br /> i. A revised Quality manual is attached with an updated organizational <br /> chart. Patrick Aleman is the representative from the Western Refractory <br /> Quality Control Department. <br /> ii. The mine will work with Western Refractory to provide a fill turnover <br /> documentation package for all work activates. <br /> iii. The statements in the Western Refractory QC manual paint with broad <br /> strokes because no two jobs are the alike. The manual is used to outline <br /> what governing codes/clients may require. The notes section in the <br /> drawing package outlines that ASME B31 and AWS DI.1. will be <br /> referenced for weldment and testing. <br /> iv. All of the reagent piping within the mill is defined as category D or normal <br /> fluid service piping per ASME B31.3. The Western Refractory QAQC <br /> Manual is only an outline and non-destructive examination (NDE) is <br /> determined by governing codes. ASME requires 5% NDE (UT RT) be <br /> performed for Category D piping. By the rules set forth by ASME only <br /> require hydrostatic testing be performed. Per ASME B31.3 341.4.1. <br /> V. The rules of ASME B31.3 will apply to NDE performed. Per ASME B31.1 <br /> 341.4.1 <br /> vi. All piping are pressure tested after assembly. Tests are conducted per <br /> ASME B31.3 345.1. <br /> vii. Nonmetal piping is subject to a service/hydrotest after assembly. <br /> 181Pa * e <br />