My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-14_REVISION - M2012032 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-06-14_REVISION - M2012032 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 7:28:02 AM
Creation date
6/15/2021 7:01:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
6/14/2021
Doc Name
Adequacy Review Response
From
Ouray Silver Mines, Inc.
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_M� <br /> CX R4Y"_5LVER A41NES <br /> used and references equipment size of an 8 in internal diameter. All <br /> information including construction drawings for the Reagent <br /> Building indicate that thepiping system will consist of 2 inch or <br /> smaller diameter piping. Please clarify why this form was included <br /> and what its applicability is to the Reagent Building. <br /> b. Sheet 100-SS <br /> i. Please commit to retaining and submitting all QA/QC <br /> documentation for each respective phase of construction as it is <br /> completed. These should beprovided in addition to the as built <br /> drawings and certifications for the components it applies to. <br /> c. QA/QC criteria is given in several different documents throughout the <br /> revision. For ease of reference, please submit a table of all QA/QC tests to <br /> be conducted during construction, including the location or phase, success <br /> criteria,the results of each test and a"Pass/ Fail" indication. This running <br /> table can be used as a summary table, to be submitted with full <br /> documentation of the QA/QC tests as anappendix to the Table. This will <br /> allow the Operator and the Division to actively track all QA/QC tests <br /> effectively and clearly. <br /> Response: <br /> a. <br /> i. A revised Quality manual is attached with an updated organizational <br /> chart. Patrick Aleman is the representative from the Western Refractory <br /> Quality Control Department. <br /> ii. The mine will work with Western Refractory to provide a fill turnover <br /> documentation package for all work activates. <br /> iii. The statements in the Western Refractory QC manual paint with broad <br /> strokes because no two jobs are the alike. The manual is used to outline <br /> what governing codes/clients may require. The notes section in the <br /> drawing package outlines that ASME B31 and AWS DI.1. will be <br /> referenced for weldment and testing. <br /> iv. All of the reagent piping within the mill is defined as category D or normal <br /> fluid service piping per ASME B31.3. The Western Refractory QAQC <br /> Manual is only an outline and non-destructive examination (NDE) is <br /> determined by governing codes. ASME requires 5% NDE (UT RT) be <br /> performed for Category D piping. By the rules set forth by ASME only <br /> require hydrostatic testing be performed. Per ASME B31.3 341.4.1. <br /> V. The rules of ASME B31.3 will apply to NDE performed. Per ASME B31.1 <br /> 341.4.1 <br /> vi. All piping are pressure tested after assembly. Tests are conducted per <br /> ASME B31.3 345.1. <br /> vii. Nonmetal piping is subject to a service/hydrotest after assembly. <br /> 181Pa * e <br />
The URL can be used to link to this page
Your browser does not support the video tag.