Laserfiche WebLink
�6 ib�l <br /> CX,RAY SiLLER MvvEs <br /> 27. It is understood that the double walled piping will be an additional redundancy <br /> that will be field fit and is not included in the engineered drawings, and that the <br /> as built certifications will include more details of the double walled construction <br /> of the piping. However, the information provided thus far is too vague to be fully <br /> evaluated. Please provide a narrative discussing the general construction <br /> materials that will be used, field fit methods and areas along the length of the <br /> delivery lines that will be double walled. This information can be updated and <br /> modified in the as built certifications,but general plans should be addressed prior <br /> to construction. <br /> Response: The only area that double-walled piping will be used is in the new <br /> compressor room adjacent to the reagent room. The compressor room does have <br /> containment, but the mine would like additional protection in the area to help prevent <br /> material release from the pipe in the compressor room. Pipe materials are described in <br /> the table on drawing 700-MP-207 and 700-MP-208. The cable tray layout through this <br /> area along with the pipe diameters are shown on drawing 700-MP-204 section 3. The <br /> pipes in the cable tray will be double walled for 25 ft trough the compressor room. <br /> 28. Quality Assurance and Quality Control - Rule 6.4.21(16) <br /> a. Contractors Quality Control Program Manual provided by Western <br /> Refractory Construction, Inc, <br /> i. This document is dated January 3, 2012. Please provide a more <br /> recent version of the piping and components manual, as well as <br /> identify who theQC administrator will be. <br /> ii. Commit to providing all QA/QC documentation including change <br /> orders or alteration documentation for each respective phase of <br /> construction as it iscompleted.These should be provided in addition <br /> to the as built drawings and certifications for the components it <br /> applies to. <br /> iii. The QA/QC measures described in the manual are extremely <br /> generic, please explain how these measures will be specifically <br /> applied and implemented to the construction of the Reagent Room. <br /> iv. What percentage of welds will receive the NDE testing described <br /> in the manual? <br /> V. The QA/QC manual does not address additional or increased testing <br /> as the result of a failed NDE test. If a welder fails, what is the <br /> increased testing percentage for that welder? <br /> vi. At what point in construction will hydro-testing be implemented? <br /> Describethe details and evaluation for success criteria. <br /> vii. The testing procedures described relate specifically to metal piping. <br /> What method(s) will be employed to PVC piping to ensure <br /> connections? <br /> viii. The document includes an inspection and maintenance form from <br /> Hess Corporation indicating that a "Pig Launcher" system will be <br /> 171Pa w <br />