My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-09_REVISION - M2001046 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001046
>
2021-06-09_REVISION - M2001046 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 12:21:37 PM
Creation date
6/10/2021 6:16:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001046
IBM Index Class Name
Revision
Doc Date
6/9/2021
Doc Name
Adequacy Review #2
From
DRMS
To
Ready Mixed Concrete Company
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Joslriva Oliver <br /> June 9,2021 <br /> Page 4 o l`4 <br /> • DRMS acknowledges the statements provided that no groundwater will be exposed prior to approval of <br /> slurry walls other than the freshwater and siltation ponds, and that the bond for the"southern" slurry wall <br /> will be provided in the future through the revision process prior to commencement of installation of that <br /> slurry wall. <br /> • Cost to remove"batch plant" shown on mining plan map. This information will need to correlate with the <br /> configuration of the batch plant provided in the mining plan. <br /> • Listing of equipment to be utilized to complete needed tasks(scraper, dozer, grader, water truck, etc). <br /> DRMS will verify the required bond when the information requested is provided and all remaining adequacy <br /> issues have been resolved. <br /> EXHIBIT S-Permanent Man-Made Structures (Rule 6.4.19): <br /> • As previously stated,the unlined slopes of the freshwater and siltation pond are shown on the modified <br /> mining plan map as 1:1, however, the submitted geotechnical stability exhibit provides analysis of 2:1 <br /> slopes for all excavations, and only in three locations for the entire site. Please either re-run the stability <br /> model to demonstrate adequate setbacks for the freshwater and siltation pond at a 1:1 slope and at the <br /> maximum projected depths, or modify the mining plan map to reflect 2:1 slopes for these excavations as <br /> described in the current stability exhibit. <br /> • Please also describe in detail how it was determined that only 3 sections would be needed to provide <br /> adequate stability setback data for all structures within and within 200' of the permit area, and how those <br /> sections were selected. Additional analysis may be required for structures currently shown to be within <br /> mining cells as shown in the submitted revised maps. <br /> This concludes the Division's preliminary adequacy review of this application. This letter shall not be construed <br /> to mean that there are no other technical deficiencies in your application. Other issues may arise as additional <br /> information is supplied. Please remember that the decision date for this amendment application is June 17,2021. <br /> As previously mentioned, if you are unable to provide satisfactory responses to any inadequacies prior to this <br /> date, it will be your responsibility to request an extension of time to allow for continued review of this <br /> application. If there are still unresolved issues when the decision date arrives and no extension has been <br /> requested,the application will be denied. If you have any questions, please contact me at(303) 866-3567 x8140. <br /> Sincerely, <br /> Eric Scott—Environmental Protection Specialist <br /> CC: <br /> Enclosures: <br />
The URL can be used to link to this page
Your browser does not support the video tag.