Laserfiche WebLink
iii. grade and slope reclaimed areas rip with dozer broadcast seed mix. <br /> c. Boundaries will be clearly marked with t- posts. <br /> 19.Overburden is not likely for we plan on using all materials in products,will stockpile some for <br /> reclamation. <br /> 20. Stream Diversion Reclamation: All berms created will be recontoured and spread though out the <br /> reclaimed site. <br /> 21.Access Road:The entrance and access road will be regraded and recontoured followed by <br /> ripping/scarifying and reseeding, culvert will be taken out and sloped and seeded. If erosion is an issue <br /> straw or geotextiles will be used for stabilization. <br /> 22. Reclamation Costs: topsoil and overburden for reclamation will depend on the area disturbed. <br /> We are going in 2 phases, 1st phase will be 4 acres, second phase is 5.93 acres. We will also be <br /> mining towards reclamation. We will put our processing area on bottom elevation and push <br /> materials down from higher elevation to processing area so everyday will be working towards <br /> reclamation.Total square feet for 9.93 acres is 432,550 sq ft so V topsoil or overburden will be <br /> 36046 cubic feet approx. 1459 tons. Grade out with overburden/soil scarfire and place topsoil and <br /> broadcast seed,will have on site if needed 770 grader, D6 dozer, 938 loader, mini excavator, <br /> broadcaster, dump truck, and access road material will also be used for reclamation. <br /> 23. Exhibit Map Requirements: <br /> a. redo map put name of applicant <br /> b. redo map put signature of person doing map <br /> c. redo map put date map was prepared <br /> d. redo map identify exhibit letter <br /> e. redo map use appropriate legend <br /> f. redo map use map title <br /> 24. Land Owners and Structures: redo map Exhibit E include: all surface owners, permanent man- <br /> made structures <br /> 25.Reclamation Features: redo map Exhibit E include general areas, shub or tree planting, average <br /> thickness of replaced overburden by reclamation area or phase, and average thickness of replaced <br /> topsoil by reclamation area or phase. <br /> 26. Right to Enter: Exhibit G-Source of Legal Right To Enter—Plan of Operations from BLM <br /> 27. Clarification: Exhibit H- Municipalities Within two Miles-We confirm there are no municipalities <br /> within two miles of our site. <br /> 28. Eligible Structures: Exhibit L- Permanent Man-Made Structures—include in Exhibit B, and shown <br /> On Exhibit E maps as well as Exhibit L <br />