Laserfiche WebLink
I e6-1 MVB USFS <br /> I e6-2 MVB USFS 0.86 2018 <br /> 1 e6-3 MVB USFS <br /> I Access road to e6-1 through-3 Road USFS 0.23 2018 <br /> 1 e6-5 MVB USFS 0.29 2018 <br /> 1 e6-6 MVB USFS 0.57 2018 <br /> 1 11lwe6x53 Exploration/MVB USFS N/A N/A Drilled on existing road <br /> I e6-7 MVB USFS 0.45 2018 <br /> 1 Access road to e6-5 through-7 Road USFS 1.27 2018 <br /> 1 e6-8 MVB USFS <br /> 1 e6-9 MVB USFS 0.50 2018 <br /> I Access road to e6-8 and-9 Road USFS 0.21 2018 <br /> 1 e6-10 MVB USFS 0.67 2018 <br /> 1 e6-11 MVB USFS 0.61 2018 <br /> 1 Access road to e6-10 and-11 Road USFS 1.40 2018 <br /> 1 e6-12 MVB USFS 0.59 2018 <br /> 1 Access road to e6-12 Road USFS 0.23 2018 <br /> 1 101we7x72(101we700) Exploration/MVB USFS N/A N/A Drilled on existing road <br /> I 17LC-01 Exploration USFS N/A N/A Drilled on existing road <br /> I 17LC-05 Exploration USFS 0.21 2017 <br /> 1 17LC-06 Exploration USFS 0.12 2017 <br /> 1 17LC-07 Exploration USFS 0.23 2017 <br /> 1 SOM-16-H Monitoring well USFS N/A N/A No pad <br /> I SOM-2-H Monitoring well USFS N/A N/A No pad <br /> I SOM-231-11 Monitoring well USFS N/A N/A No pad <br /> I SOM-231-12 Monitoring well USFS N/A N/A No pad <br /> I SOM-231-13 Monitoring well USFS N/A N/A No pad <br /> I SOM-231-14 Monitoring well USFS N/A N/A No pad <br /> I SOM-451-12 Monitoring well USFS N/A N/A No pad <br /> I SOM-13 Monitoring well USFS N/A N/A No pad <br /> I SW-1 Monitoring well USFS N/A N/A No pad <br /> Total 22.58 <br /> II. CRITERIA AND SCHEDULE FOR BOND RELEASE <br /> PHASE <br /> Rule 3.03.1(2)(a) states, "Up to sixty percent of the applicable bond amount shall be released when the <br /> permittee successfully completes backfilling,regrading, and drainage control in accordance with the <br /> approved reclamation plan." With regard to Phase I bond release,the approved reclamation plan for the <br /> West Elk Mine is given in section 2.05.4 of the Permit Application Packet(PAP). The parts of the <br /> reclamation plan applicable to the sites included in Table 1 call for the proper sealing of drill holes (see <br /> below), and the regrading of the drill pads and associated roads to approximate original contour. During <br /> regrading any highwalls and mudpits must be backfilled. None of the sites in Table 1 required the re- <br /> establishment of a permanent drainage. <br /> Details of the procedures for the sealing of drill holes are given on page 2.05-87 of the PAP: <br /> Exploration drill holes, AIVBs, and other drill holes will be sealed in one of thefollowing ways, <br /> C-1980-007 Page 6 of 10 <br />