Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br /> Task description: Load,Haul and Regrade Collom Topsoil from 25B <br /> Site: Colowyo Coal Mine Permit Action: MR232 Permit/Job#: C1981019 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 5/27/2021 County: Moffat Filename: C <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: KOMATSU 830E <br /> -Loader: LETOURNEAU L2350 <br /> Support Equipment-Load Area: Cat DI IT- 11U <br /> -Dump Area: Cat DI IT- 11U <br /> Road Maintenance-Motor Grader: CAT 16M <br /> -Water Truck: Water Tanker, 14,000 Gal. <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 100 100 50 50 <br /> Ownership cost/hour: $197.30 $437.04 $300.25 $300.25 $55.79 $90.47 <br /> Operating cost/hour: $220.67 $438.57 $250.88 $250.88 $30.04 $67.37 <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own. NA $0.00 $0.00 $0.00 $0.00 $0.00 <br /> cost/hour: <br /> Ripper op.cost/hour: NA $0.00 $0.00 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $34.42 $40.71 $41.30 $41.30 $28.56 $21.12 <br /> Unit Subtotals: $452.39 $916.31 $592.43 $592.43 $114.39 $178.96 <br /> Number of Units: 4 1 1 2 1 1 <br /> Group Subtotals: Work: $2,725.87 Support: $1,777.29 Maint: $293.35 <br /> Total work team cost/hour: $4,796.51 <br /> MATERIAL QUANTITIES <br /> Initial volume: 307,605 CCY Swell factor: 1.125 <br /> Loose volume: 346,056 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity <br /> Truck Payload(weight)Basis: <br /> Material weight: 2,550 Pounds/LCY <br /> Description: Earth-Dry packed <br /> Rated Payload: 492,200 Pounds <br />