Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Additional Collom Topsoil Replacement <br /> Site: Colowyo Coal Mine Permit Action: MR232 Permit/Job#: C1981019 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 5/27/2021 County: Moffat Filename: C019-000 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Load,Haul and Regrade Collom Topsoil from 25B TRUCKI 1 93.26 $447,341 <br /> 002 Reseed Collom Pit and Temporary Spoil Pile REVEGE 1 60.00 $68,781 <br /> 003 Reseed Topsoil Pile 25B Footprint REVEGE 1 26.00 $28,981 <br /> SUBTOTALS: 179.26 $545,103 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $11,011 <br /> Performance bond: 1.05 Total= $5,724 <br /> Job superintendent: 89.63 Total= $6,234 <br /> Profit: 10.00 Total= $54,510 <br /> TOTAL O&P= $77,479 <br /> CONTRACT AMOUNT(direct+O&P)= $622,582 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 2.00 Total= $12,452 <br /> Reclamation management and/or administration: 1.91 $11,891 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $101,822 <br /> TOTAL BOND AMOUNT(direct+indirect)= $646,925 <br />