My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-12_PERMIT FILE - C1981038A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2021-05-12_PERMIT FILE - C1981038A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 10:29:05 AM
Creation date
5/25/2021 12:53:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
5/12/2021
Section_Exhibit Name
Volume 7 2.05 Operation and Reclamation Plans Paonia Loadout
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Status: Small shop is still in use. <br />12. Train loadout substation <br />This substation, primary voltage 46 kV, was used to <br />supply power to the elevating conveyors, bag houses, <br />vibratory feeders, lighting and hydraulics needed to <br />operate the truck dump, silo and train loadout facilities. <br />It is fenced with chain link and measures approximately <br />50 feet wide by 70 feet long and 10 feet high. It <br />contains switchgear and transformers mounted on <br />concrete pads. <br />Reclamation Status: Substation has not been removed <br />from site. <br />13. MCC Buildings (4) <br />1. The MCC building located just southwest of the <br />shop area controlled motors for the train loadout <br />elevating conveyor. It was masonry in construction <br />with a metal roof and a poured concrete slab <br />floor/foundation. This MCC was approximately 30 feet <br />long by 20 feet wide and 10 feet tall. <br />Reclamation Status: Removed from site. <br />Reclamation activities occurred in 2007. <br />2. The MCC building located immediately to the <br />north of the train loadout controlled the electrical <br />system of the loadout. It was masonry in construction <br />with a metal roof and a poured concrete slab <br />floor/foundation. This MCC was approximately 32 feet <br />long by 24 feet wide and 10 feet tall. <br />Reclamation Status: Removed from site. Reclamation <br />activities occurred in 2007. <br />RN -07 2.05-11 02/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.