Laserfiche WebLink
Stages of reclamation. <br /> The stages of opening of the Smith pit is as numbered above. <br /> After stages 1-2 are opened reclamation will start <br /> Top soil piles will be seeded with approved seed mixture to ensure top soil will stay viable <br /> Pit road and cattleguard are to be left after reclamation for landowners use. <br />