My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-24_PERMIT FILE - M2021035
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021035
>
2021-05-24_PERMIT FILE - M2021035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 6:53:43 AM
Creation date
5/25/2021 6:48:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021035
IBM Index Class Name
PERMIT FILE
Doc Date
5/24/2021
Doc Name
Application
From
Yuma County
To
DRMS
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br /> MINING PLAN <br /> 6.4.4 (e) An approximate timeline will put us in excavation mode <br /> in about 8 weeks after permit approval and removal of <br /> material in approximately 1 month after that period. This <br /> will be a long term mine. Any reclamation will likely take <br /> place in 5to 10 years. The mine will be intermittent and <br /> operate less than 180 days per year. Material from this site <br /> will be loaded by loader and hauled with trucks to <br /> county roads. <br /> (i)Topsoil removal should take 4-6 weeks; overburden <br /> removal, another 4 weeks. Material haulage is <br /> estimated at 1 Oto 20 years. Reclamation is estimated <br /> to take 2 years or two growing seasons, depending on <br /> weather conditions. <br /> (ii)The stages are planned to be in approx..10 acre <br /> increments. <br /> We will start in the south and work our way north. As <br /> each stage is completed, overburden and topsoil will be <br /> replaced to begin the re-growth process. <br /> As the east side of the mining operation is completed, <br /> mining will move to the north . <br /> (f) <br /> (i) The topsoil ranges from 1-2 feet and 3to 4 ft <br /> of overburden. <br /> (ii) Another 10-18 ft. red clay base material then gravel. <br /> This material is located on a red clay bottom. <br />
The URL can be used to link to this page
Your browser does not support the video tag.