My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-24_PERMIT FILE - M2021035
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021035
>
2021-05-24_PERMIT FILE - M2021035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 6:53:43 AM
Creation date
5/25/2021 6:48:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021035
IBM Index Class Name
PERMIT FILE
Doc Date
5/24/2021
Doc Name
Application
From
Yuma County
To
DRMS
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D <br /> MINING PLAN <br /> 6.4.4 (a) Access to pit will be from CR 13 using the landowners <br /> existing Road. A cattle guard will be installed and left <br /> after mining is completed. We will begin by removing <br /> topsoil and placing it on the north side of the <br /> boundary. Soil will be moved with scraper and <br /> bulldozer. Soil will be held 25 ft. inside the boundary <br /> to leave an area for inspection and maintenance. <br /> Topsoil removal will take approximately 4-6 weeks. <br /> (b) Any remaining overburden will be removed by scraper and <br /> bulldozer and placed along the north side of our working <br /> area. This should be accomplished in about 4 weeks. <br /> (c) Topsoil and overburden will be placed to build a dike <br /> around the active mining area. This will create a diversion <br /> to create a visual block of the Mining area. <br /> and to help with reducing noise levels for adjacent <br /> landowner. <br /> (d) We will open and excavate in a phase like increments. This <br /> will help to lessen the impact on the pasture area and help to <br /> lessen the cost to reclamation. The pit will be reclaimed as <br /> we go. The landowner will be able to run livestock on the <br /> undisturbed portions of the area. Landowner's fence will <br /> help to secure our permitted area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.