Laserfiche WebLink
Exhibit D <br /> MINING PLAN <br /> 6.4.4 (a) Access to pit will be from CR 13 using the landowners <br /> existing Road. A cattle guard will be installed and left <br /> after mining is completed. We will begin by removing <br /> topsoil and placing it on the north side of the <br /> boundary. Soil will be moved with scraper and <br /> bulldozer. Soil will be held 25 ft. inside the boundary <br /> to leave an area for inspection and maintenance. <br /> Topsoil removal will take approximately 4-6 weeks. <br /> (b) Any remaining overburden will be removed by scraper and <br /> bulldozer and placed along the north side of our working <br /> area. This should be accomplished in about 4 weeks. <br /> (c) Topsoil and overburden will be placed to build a dike <br /> around the active mining area. This will create a diversion <br /> to create a visual block of the Mining area. <br /> and to help with reducing noise levels for adjacent <br /> landowner. <br /> (d) We will open and excavate in a phase like increments. This <br /> will help to lessen the impact on the pasture area and help to <br /> lessen the cost to reclamation. The pit will be reclaimed as <br /> we go. The landowner will be able to run livestock on the <br /> undisturbed portions of the area. Landowner's fence will <br /> help to secure our permitted area. <br />