Laserfiche WebLink
Boreholes were being drilled for a future blast along the eastern portion of the Collom Pit. <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5,4.05.6; Discharge Structures 4.05.7,4.05.10; <br /> Diversions 4.05.4;Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage —Acid and Toxic Materials 4.05.8;Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18: <br /> Primary ditches associated the East,West, South Taylor and Collom Pit were inspected.All ditches were stable <br /> with no issues.Minor water conveyance was observed in the Final East Pit Ditch and the North Trib. East Pit <br /> Ditch.All other ditches appeared dry. <br /> Most stock tanks located in the remaining East Pit and West Pit held water.No issues. <br /> Most ponds at the Colowyo Mine were inspected and held water due to seasonal weather conditions. It was <br /> indeterminable whether discharge was occurring but all ponds were stable. <br /> Final East Pit and North Trib,East Pit Ditches. Section 26 Pond with D1 and D2 Ditches. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Collom Pit progression is being focused along the eastern portion of the pit adjacent to the Collom Facilities area. <br /> R <br /> Collom Pit progression. <br /> SLIDES and DAMAGE -Rule 4.12: <br />