Laserfiche WebLink
r <br /> West Pit backfill and cross rip. <br /> EXCESS SPOIL and DEVELOPMENT WASTE—Rule 4.09 <br /> Placement;Drainage Control; Surface Stabilization: <br /> The Collom Temporary spoil pile continues to progress to the north in additional lifts as well as new progression <br /> to the east as well. Lower lifts continue to expand within the limits of the approved pile footprint. <br /> _ 'yt <br /> k <br /> Collom Temporary Spoil Pile. <br /> EXPLOSIVES—Rule 4.08 <br /> Distance Prohibitions 4.08.4; Warnings 4.08.4; Control of Adverse Effects 4.08.4: <br />