Laserfiche WebLink
CIK Milling Company,LLC <br /> Penn Mine Lake County, Colorado <br /> Table 5-3: Reclamation Cost <br /> Task Description Rate Cost <br /> Direct Costs <br /> 1 Mobilize/Demobilize $2,000 <br /> 2 Prepare Mulch $4,471 <br /> 3 Prepare&Seed Disturbed Area $11,699 <br /> Total Direct Cost $18,170 <br /> Indirect Cost <br /> Liability Insurance 2.50% $454 <br /> Performance Bond 1.50% $273 <br /> Contractor Profit 15% $2,726 <br /> Project Management 10% $1,817 <br /> Total Indirect Cost $5,269 <br /> TOTAL COST $23,439 <br /> Initial Application / March 2021 5-6 <br />