My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-17_PERMIT FILE - M2021032
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021032
>
2021-05-17_PERMIT FILE - M2021032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 6:47:26 AM
Creation date
5/18/2021 7:13:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021032
IBM Index Class Name
PERMIT FILE
Doc Date
5/17/2021
Doc Name
Application
From
CJK Milling Company, LLC
To
DRMS
Email Name
DMC
THM
AWA
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UK Milling Company,LLC <br /> Penn Mine / Lake County, Colorado <br /> Table 4-1: Mining Sequence Production Blocks <br /> Penn 1 Penn 3 <br /> B1-CI-D1-El A2-A3 <br /> A3-A4-B5-05-D5 B1-B2-B3-B4 <br /> B4-C4-B3-C3-B2-C2 C1-C2-0-C4 <br /> D4-E4-F4 - <br /> D3-E3-F3 - <br /> D2-E2-F2 - <br /> • Once an area is mined-out, exposed topsoil will be contemporaneously graded to approximate <br /> original contours in preparation for reclamation. Reclamation will lag production by 2 production <br /> Blocks. This will allow a safe working space between production and reclamation activities. <br /> Mining <br /> • Loading & Screening. An excavator will feed material into the power-screen hopper. The <br /> excavator will be equipped with a 1.2 yd3 bucket. A small bucket was selected to allow for <br /> selectivity during mining. The power screen will be set a 2-inch. <br /> +2-inch material is generally development rock.Testing has shown this to be low grade considered <br /> to be waste. Waste will be stockpiled by the power screen waste conveyor, then will be used as <br /> fill for; (1) existing exploration holes, and (2) collapsed shafts, safety permitting. Waste piles are <br /> shown in Figure 6-7, Exhibit E Section 6.4. <br /> The power-screen "ore" conveyor will directly load 12yd3 tandem trucks for transport to the mill. <br /> • Hauling. The trucks will haul the material approximately 5.8 miles to the Leadville Mill for <br /> processing. <br /> • Utility. A small bulldozer and loader/backhoe will be on site for site clean-up, haul road <br /> construction and maintenance, and reclamation grading. A mulcher will be on-site to create the <br /> Mulch. <br /> • Water Truck The water truck will be used for on- and off-site road dust control mitigation <br /> Mine Equipment. The following equipment will be on site. <br /> Table 4-2: Mining Equipment <br /> Units Description Nominal Size <br /> 1 Excavator 1.2yd3, 159hp <br /> 1 Power screen double deck, 20hp <br /> 1 Dozer 10', 135hp <br /> 2 Haul Truck,Tandem 12yd3 <br /> 1 Loader 3yd3, 231hp <br /> 1 Water Truck 4,000 gallon <br /> 1 Mulcher - <br /> 4.1.6 Significant Disturbances <br /> 6.3.3(1)(f). Specify the dimensions of any significant disturbances to the land surface such as pit excavations, mine <br /> benches, impoundments,stockpiles,waste rock disposal areas,etc. <br /> Initial Application / March 2021 4-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.