My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-17_PERMIT FILE - M2021032
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021032
>
2021-05-17_PERMIT FILE - M2021032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 6:47:26 AM
Creation date
5/18/2021 7:13:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021032
IBM Index Class Name
PERMIT FILE
Doc Date
5/17/2021
Doc Name
Application
From
CJK Milling Company, LLC
To
DRMS
Email Name
DMC
THM
AWA
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CJK Milling Company,LLC <br /> Penn Mine I Lake County, Colorado <br /> 1 . 0 RULE 6 . 3 110 LIMITED IMPACT PERMIT <br /> APPLICATION <br /> 1 . 1 RULE 6 . 1 - REQUIREMENTS FOR SPECIFIC OPERATIONS <br /> 1.1.1 General Provisions <br /> This Rule provides for the specification of Exhibits required to be submitted along with each type of <br /> Permit application. <br /> 1.1.2 110 or Non-In Situ Leach Mining 110d Limited Impact and 112, 112d, 110 ISL or 112 ISL <br /> Reclamation Operations <br /> These operations shall provide all the Exhibits, as described in Rules 6.3 and 6.4, as applicable to the <br /> operation type. However, such operations may also be required to comply with Rules 6.5 (Geotechnical <br /> Stability Exhibit) and 7.3 (Environmental Protection Facilities - Design and Construction Requirements)on <br /> a case-by-case basis. Where such compliance may be required, such operations shall not be Designated <br /> Mining Operations nor be required to submit an Environmental Protection Plan, however, the provisions <br /> of Rules 6.5 and 7.3, required to be submitted, shall be incorporated into the operation's Permit as <br /> enforceable Permit conditions. <br /> Rules 6.5 (Geotechnical stability exhibit) and Rule 7.3 (Designated Mining Operations) is not applicable to <br /> the Penn Mine permit application. <br /> 1.1.3 Reserved <br /> 1.1.4 Requirements for All Designated Mining Operations and Requirements for All In-Situ <br /> Leach Mining Operations <br /> In addition to all other required Exhibits, as described in Rules 6.3 and 6.4, all Designated Mining <br /> Operations shall also provide an Exhibit U - Environmental Protection Plan pursuant to Rule 6.4.21. <br /> Exhibit U may be modified as provided in Rule 7.2.5. Also, in addition to the Exhibits described in Rules <br /> 6.3, 6.4 and 6.4.21, all In Situ Leach Mining Operations shall also provide the Exhibits in Rules 6.4.22, <br /> 6.4.23, 6.4.24 and 6.4.25. <br /> Not Applicable for this permit application. <br /> 1 . 2 RULE 6 . 2 - GENERAL REQUIREMENT OF EXHIBITS <br /> (1) This Rule provides for the guidelines for, and information requirements of, each Exhibit required to be <br /> submitted with the permit application,as specified according to Rule 6.1. <br /> (2) Maps and Exhibits <br /> (3) Maps, except the index map, must conform to the following criteria: <br /> a) show name of Applicant; <br /> b) must be prepared and signed by a registered land surveyor, professional engineer, or other qualified <br /> person; <br /> c) give date prepared; <br /> Initial Application / March 2021 1-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.