Laserfiche WebLink
II GVB-LW-18-09,(-0913 and-09C not drilled,road to USFS 2017 1.65 Ex.2.04-E3,Item 9 <br /> remain at landowner request) <br /> II GVB-LW-19-01A,(road to remain at landowner request) Hotchkiss 2017 1.32 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II GV13-LW-19-0113 Hotchkiss,(road to remain at landowner request) Ranch 2017 0.74 Ex.2.04-E3,Item 9 <br /> II GVB-LW-19-01C,(road to remain at landowner request) Hotchkiss 2017 0.69 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II GVB-LW-19-01D,(road to remain at landowner request) Hotchkiss 2017 0.9 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II GVB-LW-19-02,(road to remain at landowner request) Hotchkiss 2017 1.14 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II GVB-LW-19-02B,(road to remain at landowner request) Hotchkiss 2017 0.84 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II GVB-LW-19-03B,(road to remain at landowner request) Hotchkiss 2015 1.05 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II GVB-LW-19-04,(road to remain at landowner request) HotchkissRanch 2017 0.7 Ex.2.04-E3,Item 9 <br /> II GVB-LW-19-04B,(road to remain at landowner request) Hotchkiss 2017 1.13 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II GVB-LW-19-05,(road to remain at landowner request) Hotchkiss 2017 0.96 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II GVB-LW-19-06 USFS 2017 1.42 Ex.2.04-E3,Item 9 <br /> II GVB-LW-19-07 USFS 2017 1.13 Ex.2.04-E3,Item 9 <br /> II GVB-LW-19-08,(-0813 and-08C not drilled) USFS 2016 1.89 Ex.2.04-E3,Item 9 <br /> II GVB-LW-19-09 USFS 2017 1.27 Ex.2.04-E3,Item 9 <br /> Hotchkiss Acreage included <br /> II HGBMP Ranch 2017 with GVB-LW-19- 0 Ex.2.04-E3,Item 9 <br /> 01A <br /> II TGBMPA Hotchkiss 2017 1.1 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II HGA USFS 2017 1.54 Ex.2.04-E3,Item 9 <br /> II TGA USFS 2017 0.76 Ex.2.04-E3,Item 9 <br /> II 513 Hotchkiss 2017 0.79 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II DW-1,-2,including road USFS 2017 3.7 Ex.2.04-E3,Item 9 <br /> 50.44 <br /> II. CRITERIA AND SCHEDULE FOR BOND RELEASE <br /> PHASE II <br /> Rule 3.03.1(2)(b) states, "Up to eighty-five percent of the applicable bond amount shall be released upon <br /> the establishment of vegetation which supports the approved postmining land use and which meets the <br /> approved success standard for cover...based on statistically valid data collected during a single year of <br /> the liability period". In regard to Phase II bond release,Rule 3.03.2(3)(b) also states, "No more than <br /> sixty (60)percent of the bond shall be released so long as the lands to which the release would be <br /> applicable are contributing suspended solids to streamflow or runoff outside the permit area in excess of <br /> premining levels as determined by baseline data or in excess of levels determined on adjacent nonmined <br /> areas". <br /> C-1981-022,SL-3 Page 6 of 10 <br />