Laserfiche WebLink
application were received by the Division. <br /> The Division scheduled and conducted a bond release inspection on October 21, 2020. The site <br /> inspection was conducted in accordance with Rule 3.03.2(2). The inspection was attended by Doug <br /> Smith of Oxbow. Representatives of the Office of Surface Mining, Reclamation and Enforcement <br /> (OSMRE),the US Forest Service Paonia Ranger District(USFS), and the Bureau of Land Management, <br /> Uncompahgre Field Office(BLM)were notified but did not attend. <br /> The final list of sites to be Phase II released with SL-3 is given in Table 1,below. All of the sites in the <br /> table were Phase I released with SL-2. <br /> Table 1 <br /> Phase Site Details Landowner Reclamation Comments Acreage Acreage Source <br /> Date <br /> II CBM-1 through 14,including roads BLM 2017 6.22 Ex.2.04-E3,Item 9 <br /> II GVB-LW-7-04 BLM 2017 0.2 Ex.2.04-E3,Item 9 <br /> SL-3 application, <br /> II GVB-LW8-03 pilot plus 569'of road BLM 2017 0.62 verified from aerial <br /> imagery <br /> II GVB-LW-8-04 BLM 2017 0.14 Ex.2.04-E3,Item 9 <br /> GVB-LW-16-01,-01B,-01C,-01D and-01E,including 2 Hotchkiss <br /> II 2017 2.54 Ex.2.04-E3,Item 9 <br /> pads,(road to remain at landowner request) Ranch <br /> II GVB-LW-16-08,(-0813 not drilled) USFS 2017 0.64 Ex.2.04-E3,Item 9 <br /> II GVB-LW-17-02,-02B and-02C Hotchkiss 2017 0.72 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II GVB-LW-17-05 and-0513,(road to remain at landowner Hotchkiss 2017 1.5 Ex.2.04-E3,Item 9 <br /> request) Ranch <br /> II GVB-LW-17-06,-06B and-06C,(-06D not drilled) USFS 2017 1.17 Ex.2.04-E3,Item 9 <br /> II GVB-LW-17-07 USFS 2017 0.43 Ex.2.04-E3,Item 9 <br /> II GVB-LW-17-08,-08B and-08C,(-08D and-08E not drilled) USFS 2017 1.22 Ex.2.04-E3,Item 9 <br /> II GVB-LW-17-09 road only USFS 2017 0.2 GPS verified <br /> Hotchkiss <br /> II GVB-LW-18-01B Ranch 2017 0.65 Ex.2.04-E3,Item 9 <br /> II GVB-LW-18-02 Hotchkiss 2017 0.99 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II GVB-LW-18-02B,(road to remain at landowner request) Hotchkiss 2017 0.99 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II GVB-LW-18-03,(road to remain at landowner request) Hotchkiss 2017 0.62 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II GVB-LW-18-03B Hotchkiss 2017 0.88 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II GVB-LW-18-04 Hotchkiss 2017 0.54 Ex.2.04-E3,Item 9 <br /> Ranch <br /> Hotchkiss SL-2 application, <br /> II GVB-LW-18-04B Ranch 2017 1.03 verified from aerial <br /> imagery <br /> II GVB-LW-18-04C,(road to remain at landowner request) Hotchkiss 2017 0.75 Ex.2.04-E3,Item 9 <br /> Ranch <br /> II GVB-LW-18-05,(-0513 not constructed,road to remain at Hotchkiss 2017 1.24 Ex.2.04-E3,Item 9 <br /> landowner request) Ranch <br /> II GVB-LW-18-06 USFS 2017 0.75 Ex.2.04-E3,Item 9 <br /> II GVB-LW-18-07 and-0713,(-07C and-07D not drilled) USFS 2016 0.78 Ex.2.04-E3,Item 9 <br /> II GVB-LW-18-08 USFS 2016 0.9 Ex.2.04-E3,Item 9 <br /> C-1981-022,SL-3 Page 5 of 10 <br />