Laserfiche WebLink
o The quarter two report states that reclamation has commenced. <br /> o The quarter four report indicated that cover material has been distributed across the <br /> waste pile and that topsoil and seeding would occur in 2020. <br /> c. Copies of the inspection findings shall be maintained at the mine site. <br /> 3. 4.10.2(3) <br /> No potential hazards were noted in the above referenced refuse pile inspection report. <br /> If you have any questions,please contact me. <br /> Sincerely, <br /> �� <br /> Robin Reilley M.S. GISP <br /> Environmental Protection Specialist II <br /> Robin.reilleykstate.co.us <br />