My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-20_REVISION - M1983033 (20)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983033
>
2021-04-20_REVISION - M1983033 (20)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 2:21:10 PM
Creation date
4/23/2021 6:08:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983033
IBM Index Class Name
Revision
Doc Date
4/20/2021
Doc Name
Request For Amendment To Permit
From
Albert Frei & Sons, Inc.
To
DRMS
Type & Sequence
AM9
Email Name
PSH
JLE
AWA
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1714
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Walstrum Spur Amendment, Exhibit E— Reclamation Plan April 2021 <br />backfilled will have nearly vertical faces with horizontal benches of varying dimensions. Revegetation in these areas <br />will focus on the horizontal benches. The Operator will place a 1- to 3-foot-thick layer, with an average of 2 feet, of <br />growth medium on the horizontal benched areas. The growth medium will be sloped gently to drain towards the <br />vertical face. See Exhibit F(F-2, cross section A). <br />Slope Reclamafion within Existing Quarry <br />The North Slope Section, as illustrated in Exhibit F(F-2, cross section C), will require backfilling, shaping, and <br />grading to final contours to create the appearance of a natural slope. These slopes will have an overall maximum <br />reclaimed slope between 3H:1V and 2H:1 V. Once mining reaches the final dig line, reclamation is planned to occur <br />concurrently with mining. The benches will be backfilled with overburden to create a subgrade base for a layer of <br />growth medium. Overburden backfill, with growth medium cover, will be placed prior to the recommended seeding <br />period each year. <br />The east side of the Existing Quarry will have an overall maximum slope of 0.6H:1 V and the west and south sides <br />will have an overall maximum slope of 1 H:1V. After mining is completed, the mined slopes will have nearly vertical <br />faces with horizontal benches of varying dimensions. Reclamation in these areas will be confined to the horizontal <br />benches. The Operator will place a 1- to 3-foot-thick layer of growth medium on the horizontal benched areas. The <br />growth medium will be sloped gently to drain towards the vertical face to reduce the amount of runoff and soil <br />erosion from the reclaimed areas. Exhibit F(F-2, cross sections B and D) illustrates typical growth medium <br />placement on Existing Quarry areas other than the North Slope Section. <br />Growth Medium placement in the Spur Amendment and Existing Quarry <br />Where growth medium is required for reclamation, it will be placed with loaders, excavators, and/or dozers. After <br />grading is complete, the surFaces will be compacted and tracked with dozers on contour to minimize erosion and <br />create microclimates for a suitable seed bed. This method will also create shade and snow catching depressions <br />which benefit seed germination and establishment. Alternatively, excavator bucket furrow contouring may be <br />deployed as another method of creating microclimates and to help prevent erosion. Additionally, vegetative scatter, <br />stable boulders, and/or rocky soil will be randomly placed on the growth medium to break sight lines, maximize <br />moisture retention, and further enhance the microclimates. When applicable but not required, the Operator may <br />elect to backfill the entire bench to its final overali slope. This protocol breaks sight lines, creates more forage and <br />develops more escape terrain for wildlife, and is aesthetically pleasing when viewed from the surrounding areas. <br />When this approach is used, the maximum slope of the growth medium will not exceed 1H:1V. <br />7.2 Seeding, Fertilization, Revegetation, and Topsoiling <br />Information on seeding, fertilization, revegetation, and topsoiling is provided in the Revegetation Plan above. <br />8.0 RECLAMATION MAP CROSS-REFERENCES <br />The map(s) of the proposed affected land, by all phases of the total scope of the mining operation, shall indicate <br />the following.� <br />6.4. 6(a) The expected physical appearance of the area of the affected land, correlated to the proposed mining <br />and reclamation timetables. The map must show proposed topography of the area with contour lines of sufficient <br />detail to portray the direction and rate of slope of all reclaimed lands; and <br />SEE EXHIBIT F-1 RECLAMATION MAP <br />6.4. 6(b) Portrayal of the proposed final land use for each portion of the affected lands. <br />SEE EXHIBIT F-1 RECLAMATION MAP AND EXHIBIT F-2 RECLAMATION DETAILS <br />DTETRA TECH P a g e � I � <br />
The URL can be used to link to this page
Your browser does not support the video tag.