Laserfiche WebLink
Construction Material Special 111 Operation Reclamation Exhibits <br /> Raindance Reservoir#2—VIMA Partners, LLC <br /> The primary commodity to be mined is sandy clay borrow material. Sandy clay <br /> borrow material is being removed for the purpose of creating a reservoir. <br /> Excavated sandy clay borrow material is being used for the 1-25 expansion <br /> project by CDOT. <br /> (o) name and describe the intended use of all expected incidental products to be <br /> mined/extracted by the proposed operation <br /> None <br /> (p) Specify if explosives will be used in conjunction with the mining or reclamation <br /> operation. In consultation with the Office, the Applicant must demonstrate, pursuant to <br /> Rule 6.5(4), Geotechnical Stability Exhibit, that off-site areas will not be adversely <br /> affected by blasting during mining or reclamation operations. <br /> None <br /> M1.1, INC.CONSULTING ENGINEERS <br />