Laserfiche WebLink
Section 1.2.1 of the report indicates that disturbance totaling 271.5 acres occurred in 2020 in I, L and N Pits. <br /> The DRMS form submitted corroborates the acres of disturbance. <br /> c. Backfilling and grading (B & G),topsoiling and seeding comprised 19.3 acres. The location <br /> and number of acres backfilled and graded during 2020 are discussed in Section 1.2.2, indicated <br /> on Table 1.1 of Appendix W. Trapper backfilled and graded 19.3 acres of land to final contour in <br /> 2020 in the L Pit. <br /> 20 April DBMS: <br /> DRMS notes a discrepancy between the 2019 year cumulative total for acres B & G and topsoiled on the <br /> 2019 form (4909.4) and for 2019 on the 2020 form 4917.60. This discrepancy was discussed during the <br /> April 2021 inspection. <br /> 3. It would be helpful if you would please provide a brief explanation of the discrepancy for the record. <br /> d. The location and the number of acres topsoiled during 2020 are discussed in section 1.2.3, <br /> indicated on Table 1.1 of Appendix W. The number of acres coincides with the number of acres <br /> backfilled and graded. <br /> e. Trapper permanently seeded 19.3 acres of land in 2020,corresponding to the areas backfilled, <br /> graded and topsoiled. The location and the number of acres seeded during 2020 are discussed in <br /> section 1.2.4 of Appendix W. Revegetation seed mixes are discussed in section 7.3 and associated <br /> tables of the report. Trapper included an invoice from Stevenson Intermountain Seed, Inc. in <br /> Section 7 of Appendix W illustrating the seeds used for reclamation. <br /> Section 1.2.5 of Appendix W discusses the cultural practices conducted in 2020. Separate sections in <br /> the report discuss each unique practice. Cultural practices include and are not limited to: <br /> o Drainage reconstruction <br /> o Development drilling <br /> o Topsoil pile construction <br /> (a) Map 1 of Appendix W depicts all previously planted parcels at the site. Each parcel <br /> identifies the acres and the year seeding occurred. <br /> Rule 2.04.13 (2): <br /> Section 3 of the report indicates that improvements and repairs were conducted on reconstructed <br /> drainages. No new drainage construction occurred in 2020. In 2020 26.9 miles of permanent drainage <br /> reconstruction took place representing approximately 141,870 linear feet. Drainage repairs or <br /> improvements were completed on approximately 11,200 linear feet in the Flume System in 2020. <br /> Table 5-lin Section 5 of Trappers report provides geographic locations for each of the topsoil stockpiles <br /> and the approximate volume stored in each pile. Topsoil stockpiles are depicted on the maps associated <br /> with the submital in Appendix W. Over the course of 2020 16 new topsoil piles were constructed. <br /> Stock tanks and dozer basins are discussed in Section 6.0 of the report. <br />