My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-21_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2021-04-21_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2021 1:43:27 PM
Creation date
4/21/2021 12:58:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
4/21/2021
Doc Name
Annual Reclamation Report Adequacy Review
From
DRMS
To
Trapper Mining Inc
Type & Sequence
TR127
Annual Report Year
2020
Permit Index Doc Type
Annual Reclamation Report
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Backfilling, grading, topsoiling and seeding comprised 19.3 acres. These values are corroborated <br /> on the DRMS form submitted as part of the report. <br /> Map I: Topographic Verification ofPMT and 2020 ARR Maps <br /> The PMT map lacked detail. DRMS compared <br /> the 100 foot contours of both maps and found <br /> 77 <br /> them to overlay adequately as illustrated. <br /> The PMT map is shown on the left with the 100 <br /> I �f foot contours. The ARR map is shown below <br /> ' the PMT map with the 2020 reclamation parcel <br /> outlined in bright blue. <br /> 41 <br /> All areas are depicted on Map 1,the Annual Reclamation Report Map comprising three sheets <br /> spanning the site. Adequacy questions are numbered in blue below. <br /> Rule 2.04.13(1): <br /> The name and address of the permittee is provided. <br /> a. The location and number of acres disturbed during 2020 are discussed in Section 1.2.1 in <br /> Appendix W. The report indicated that disturbance totaling 271.5 in the form of topsoil <br /> stripping occurred a portion of these acres comprised redisturbance. <br /> b. Previously reclaimed lands in I and N pits were redisturbed in 2020. The Redisturbance <br /> Reclamation Summary Table; Table 1.2 of Section 1,summarizes areas of redisturbance by parcel. <br /> 20 April DBMS: <br /> The report indicates that redisturbance totaling 182.9 acres of phase III reclamation occurred in 2020. While <br /> the table indicates that 182.9 acres of phase III reclamation were redisturbed, Section 1.2.6 Previously <br /> Revegetated Acres indicates 178.7 acres of phase III redisturbance in I and N pit during 2020. <br /> 2. Please explain the discrepencies pointed out above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.