Laserfiche WebLink
Backfilling, grading, topsoiling and seeding comprised 19.3 acres. These values are corroborated <br /> on the DRMS form submitted as part of the report. <br /> Map I: Topographic Verification ofPMT and 2020 ARR Maps <br /> The PMT map lacked detail. DRMS compared <br /> the 100 foot contours of both maps and found <br /> 77 <br /> them to overlay adequately as illustrated. <br /> The PMT map is shown on the left with the 100 <br /> I �f foot contours. The ARR map is shown below <br /> ' the PMT map with the 2020 reclamation parcel <br /> outlined in bright blue. <br /> 41 <br /> All areas are depicted on Map 1,the Annual Reclamation Report Map comprising three sheets <br /> spanning the site. Adequacy questions are numbered in blue below. <br /> Rule 2.04.13(1): <br /> The name and address of the permittee is provided. <br /> a. The location and number of acres disturbed during 2020 are discussed in Section 1.2.1 in <br /> Appendix W. The report indicated that disturbance totaling 271.5 in the form of topsoil <br /> stripping occurred a portion of these acres comprised redisturbance. <br /> b. Previously reclaimed lands in I and N pits were redisturbed in 2020. The Redisturbance <br /> Reclamation Summary Table; Table 1.2 of Section 1,summarizes areas of redisturbance by parcel. <br /> 20 April DBMS: <br /> The report indicates that redisturbance totaling 182.9 acres of phase III reclamation occurred in 2020. While <br /> the table indicates that 182.9 acres of phase III reclamation were redisturbed, Section 1.2.6 Previously <br /> Revegetated Acres indicates 178.7 acres of phase III redisturbance in I and N pit during 2020. <br /> 2. Please explain the discrepencies pointed out above. <br />