Laserfiche WebLink
Apri17, 2021 C-1981-019/Colowyo Coal Mine ZTT <br /> rFr <br /> R <br /> f <br /> .il' Ad <br /> { <br /> 3 <br /> e J ✓p <br /> EP1 trickle tube. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> At the time of the inspection, active coal mining operations were only observed within the Collom Pit. The <br /> highwall miner was operating at the time of the inspection. <br /> i0. <br /> cc r <br /> South Taylor Pit. Collom Pit. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 5 of 9 <br />