Laserfiche WebLink
Apri17, 2021 C-1981-019/Colowyo Coal Mine ZTT <br /> Both stock tanks associated with FEPD were approved for dewatering trickle tubes to be installed. Installation was <br /> completed in EP1 and EP2 was scheduled to have the dewatering trickle tube to be installed. No issues were <br /> observed. <br /> West Pit: <br /> The Taylor Ditch(TD),Taylor Tributary Ditch(TTD),the East Taylor Ditch(ETD)and associated stock tanks <br /> were walked and inspected.No issues were observed with any of the ditches or tanks. Tanks were dry or held <br /> minimal water and the ditches were dry. <br /> South Taylor: <br /> Section 28 and Section 29 were inspected. These channels are vegetated and stable.No issues were observed. <br /> Collom: <br /> Ditches inspected associated with the Collom Pit were diches D-1,D-2,D-3,D4 and D-6. Ditches D-1,D-2,D-3, <br /> and D-4 are all armored with rip rap. Ditch D-6 has low grade and is not armored.No erosion,cutting or issues <br /> existed with the Collom Ditches. <br /> Streeter Pond. Section 26 Pond. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 4 of 9 <br />