Laserfiche WebLink
Exhibit D Rev. 2 <br /> Applicant: Ames Construction, Inc. <br /> Name of Site: Burnham Property Borrow <br /> Date: April 5, 2021 <br /> EXHIBIT D — Reclamation Plan <br /> At the conclusion of the excavation activities, the site will be <br /> reclaimed by grading the excavation slopes to a final gradient and the <br /> excavation bottom to a uniform level. The vegetative growth support <br /> material, temporarily stored in the southern valley, will be placed on the <br /> excavation slopes and bottom. The constructed entrance and exit will be <br /> removed and its' disturbed area included in the reclamation activities. <br /> A detailed description of the Reclamation Plan is as follows: <br /> (1) <br /> (a) Overburden replacement <br /> There is no overburden to salvage and/or replace at this <br /> operation. <br /> (b) Reclaimed slope gradient <br /> The reclaimed slopes will be constructed to a 4:1 <br /> gradient. <br /> (c) Revegetation measures to reclaim the site. <br /> Ames will be utilizing CDI to seed and we will have them <br /> follow the reclamation plans the will utilized on the Lemay <br /> Realignment. <br /> Prior to the placement and incorporation of the soil <br /> amendments, topsoil will be spread over the borrow <br /> slopes, bottom and site roadway. <br /> The thickness of the plant growth medium to be replaced <br /> is 8 inches. The seedbed will be prepared by utilizing a <br /> D6 dozer with rippers to rip the soil prior to seeding. The <br /> application method for grass and forb seeding will be <br /> Page 1 of 4 <br />