Laserfiche WebLink
COLORADO <br /> co �/ Division of Reclamation, <br /> A ® Mining and Safety <br /> Department of Natural Resources <br /> March 30, 2021 <br /> Kirk Bergstrom <br /> Ames Construction, Inc. <br /> 18450 E 28th Ave <br /> Aurora, CO 80011 <br /> RE: Incompleteness Review of Special 111 Operation Construction Materials Reclamation Permit <br /> Application;Ames Construction Inc., Burnham Property Borrow; Permit No. M-2021-019 <br /> Dear Mr. Bergstrom, <br /> On March 24, 2021,the Division of Reclamation, Mining and Safety(Division) received your Special 111 <br /> Operation Construction Materials Reclamation Permit Application package for the Burnham Property <br /> Borrow pit, File No. M-2021-019. Preliminary review of the information received determined the <br /> following items must be received before the Division can consider the application as being submitted and <br /> technical review can begin. Please respond to this Incompleteness Review with the requested <br /> additional/updated information on permit replacement pages and summarize each response in a cover <br /> letter titled "Incompleteness Review Response; M-2021-019". <br /> APPLICATION: <br /> 1. Question #10, Primary Mine Entrance Location,the coordinates given to not match the coordinates <br /> given for either of the mine entrances on the Existing Conditions or Proposed Contours maps. Please <br /> update the coordinates to be consistent with the maps. <br /> EXHIBIT B—Site Description (Rule 6.3.2): <br /> 2. The list of man-made structures within 200 feet of the affected area does not list the fiber optic line <br /> owned by AT&T Transmission as shown on the maps. Please update the list to reflect the fiber optic <br /> line. <br /> EXHIBIT D—Reclamation Plan (Rule 6.3.4): <br /> 3. Please indicate the rate that straw mulch will be applied. Based on the Division's experience with <br /> mulching rates two (2)tons of mulch per acre is recommended. <br /> 4. The applicant states in the mining plan that topsoil will be salvaged and stockpiled prior to mining <br /> and when mining is completed that topsoil will be spread 8-inches over the disturbed area. On page 2 <br /> F �o <br /> �o <a: <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 https://drms.colorado.gov <br /> Jared Polis, Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director <br />