Laserfiche WebLink
Ames Construction <br /> 18450 E 28th Avenue <br /> Aurora, CO 80011 <br /> T 303-363-1000 9 F 303-363-4080 <br /> spread the topsoil before beginning phase 2,which will utilize a different topsoil <br /> stockpile location. <br /> 9. Exhibit E: how close is the gas pipeline at its closest point to the proposed permit boundary <br /> a. The gas pipeline is 318 feet at its closest point to the proposed permit boundary,the <br /> mining plan and reclamation plan maps now show this distance called out. <br /> 10. Exhibit E: please state the average thickness of replaced topsoil <br /> a. The reclamation plan map has been revised to show the proposed eight inch <br /> average thickness of replaced topsoil. <br /> 11. Exhibit H: list the mailing address &telephone number for all municipalities within 2 miles <br /> a. There are no municipalities within 2 miles of the proposed borrow site. <br /> 12. Exhibit I: provide affidavit or receipt indication the date which revised application <br /> documents were placed with the Weld County Clerk <br /> a. Please see attached,Ames placed the revised application documents with the Weld <br /> County Clerk on Thursday April 1, 2021. <br /> 13. Exhibit L: provide the Division with copies of the notarized structure agreements <br /> a. Please see the following for all permanent man-made structures: <br /> i. Poudre Valley REA (overhead power lines and utility poles) -Ames has <br /> reached a structure agreement with PVREA, and is attached. <br /> ii. Nunn Telephone Company (fiber optic line) -Ames has reached out to Nunn <br /> Telephone Company, but has not had any response yet. To suffice,Ames has <br /> obtained an engineering evaluation from Horrocks Engineers stating that the <br /> fiber optic line shall not be damaged by activities occurring at the mining <br /> operation. <br /> iii. Weld County Public Works (County Road 110) -Ames and Weld County <br /> Public Works are currently working through obtaining a structural <br /> agreement.Ames and Weld County have a meeting setup for Monday April <br /> 5th to discuss the next step forward to reaching an agreement. Once an <br /> agreement is reached,Ames can provide you with the updated agreement. <br /> 1. In the meantime,Ames has obtained an engineering evaluation from <br /> Horrocks Engineers stating that County Road 110 shall not be <br /> damaged by activities occurring at the mining operation. <br /> Thank you, <br /> Kirk Bergstr <br /> Project Manager <br /> An Equal Opportunity Employer <br /> Burnsville MN • Scottsdale AZ • Corona CA • Aurora Co • West Valley City UT • Carlin NV <br /> 0 <br />