Laserfiche WebLink
Exhibit D <br /> Dozer (similar to CAT D6) <br /> Labor: 2 equipment operators and Y2 time foreman <br /> Production rate: 150 cubic yards per hour <br /> Hours required to complete = 23,500/150 = 158 hours <br /> Equipment costs per hour = $ 240.00 <br /> Labor costs per hour = $ 150.00 <br /> Total per hour = $ 390.00 <br /> Equipment and Labor Total = 158 hours x $390 =$61 ,620 <br /> Mobilization: 2 pieces in and out = $ 1 ,200.00. <br /> TOTAL for this item = $ 62,820 or $ 2.67/cubic yard. <br /> (No markup) <br /> 2. Seedbed preparation, application of soil amendments, seed <br /> and mulch. <br /> The cost of performing these items, based on a quote <br /> from CDI is: <br /> Straw mulch $ 500/acre <br /> Tackifier $ 1100/acre <br /> Seed : $ 375/acre <br /> Total = $ 1,975/acre <br /> TOTAL for this item = 15.5 acres x $1 ,975/acre = $30,613 <br /> Total Cost to reclaim site = $62,820 + $30,613 = $93,432.5. <br /> Note: CDI will mobilize in a small tractor and a flatbed <br /> truck for this operation. The cost of mobilizing this <br /> equipment is factored into the cost of CDI's estimate. <br /> Page 3 of 3 <br />