Laserfiche WebLink
Exhibit D <br /> seed drilling. Straw mulch will be used and shall be <br /> crimped in two directions. <br /> The revegetation measures would be performed in the fall <br /> of 2021 . <br /> (d) There will be no features such as ponds, streams, roads or <br /> buildings remaining on the borrow area after reclamation. <br /> (e) All features have been previously addressed in the <br /> Reclamation Plan. <br /> (2) Cost estimate to reclaim the site. <br /> The point of maximum disturbance to site will be when the <br /> excavation activities are finished. Due to the configuration of <br /> the borrow, reclamation activities would not begin until that <br /> time. <br /> Since the excavation slopes were left at a 4:1 gradient during <br /> the borrow removal process, the remaining reclamation work <br /> would consist of removing the perimeter berms and placing the <br /> topsoil materials over the disturbed areas followed by the <br /> application of the recommended soil amendments, seed and <br /> mulch. <br /> Topsoil placement will occur during borrow. Excess rangeland <br /> topsoil from new Lemay Alignment in Fort Collins will be placed <br /> at an estimate of 16,000 CY additional over the final borrow. <br /> These costs will be charged to the new Lemay Alignment job. <br /> 1 . Placement of salvaged topsoil: <br /> Quantity = 23,500 cubic yards <br /> Equipment: Self-loading scraper (similar to CAT 623) <br /> Page 2 of 3 <br />