Phase II- approximately 6 acres, reclamation as we go, and as we can will be done on previously <br /> disturbed, removal of vegetation and trees and processed, stormwater will be controlled with ditches <br /> and berms and all is subject to change. Best management practices will be applied to manage storm <br /> water.The stock piles will be changing as more material is removed from site and deposited to the stock <br /> pile, for this reason a perimeter ditch might be used instead of a silt fence, this perimeter ditch can <br /> easily be moved and maintained with equipment. <br /> g. <br /> CQ <br /> ems' <br /> f <br /> » a r ar <br /> ..fir .w. .�.. <br /> Good housekeeping should be followed though out the whole project. <br /> - Keep machinery in good operating condition to prevent leaks. <br /> - Monitor berms and roads and drainages <br /> -Spill Kits will be on site at all times- 5 gallon kits includes gloves, sorbent, dust pan and container to <br /> collect and store the clean- up material. 20 gallon kit PPE for 2 people sorbent and materials to absorb, <br /> shovel, plastic bags,ect. No hazardous materials just POLs. On site <br /> MSDS SHEETS ON SITE <br /> Daily Inspection Sheet Logbook will be kept onsite- Inspection dates and info <br /> NON Operational- Monitor and inspect once a week <br /> Road and Site Pad will be graveled so tracking in and out of site should not be a problem. <br />