My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-22_PERMIT FILE - M2021018
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021018
>
2021-03-22_PERMIT FILE - M2021018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 3:21:06 AM
Creation date
3/23/2021 6:34:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021018
IBM Index Class Name
PERMIT FILE
Doc Date
3/22/2021
Doc Name
Application
From
Ed Lyons
To
DRMS
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mining method will be surface mining, and will start on northside of site and work towards the <br /> southside. Plan on taking off vegetation, and trees cleared approximately 4 acres for 1'phase.Then <br /> strip topsoil and berm. Then cut pad for processing,approx 1.5 acre, construct berms for safety and <br /> diversion of storm water. Cut a 25' buffer to stay off the railroad grade along the west side of site. <br /> Create and keep positive drainage. <br /> Phase 2 will be cutting and processing approximately 6 acres. Constructing and keeping positive <br /> drainage. Excavate and continue to improve slopes <br /> Processing method will be to push material northwest towards the crusher/screen/haul. Approximately <br /> 50 tons per hour is estimated safe production rate. Working benches 30'/20' and then slope off for <br /> safety.Crush screen and stock plie materials. Start off no highwalls and no blasting until needed to get <br /> materials,then will hire it out. Granite thickness to be determined and the consistency partial <br /> decomposed granite.The mine will run each season Monday—Friday 8 am-5pm, depending on demand <br /> of material (exception of BLM required dates off).Two-way radios will be used for communication. <br /> Mining depth is estimated to be 35'. Ground water is estimated to be 30-40' If get ground water will <br /> change elevation, (subject to change). Geotechnical stability will be applied if occurrence arises(Subject <br /> to change) <br /> Site will have a Cat D9 Dozer to push material to processing area. Komatsu 300 excavator to dig out <br /> materials and load machines. KPI 4233 impact crusher used to process materials. Metso Screen <br /> processing plant used to screen out materials. Koleman stacker used to stack stable stockpiles, and to <br /> get finished materials further away. Cat 938 Loader used to load and stock pile and maintain site for <br /> good housekeeping. Power Screen Marc 3 used to screen materials before processing. Water truck to <br /> maintain roads and keep dust under control. <br />
The URL can be used to link to this page
Your browser does not support the video tag.