Mr. Trent Irick Page 3 <br /> March 3, 2021 <br /> 9. Surface water disturbance. Paragraph (i) states groundwater will not be encountered, but does <br /> not discuss surface water. Based on the reclamation plan map in Exhibit E, the grade of the <br /> pit floor is towards the south at a 1% grade,towards the irrigation ditch/canal. Please describe <br /> how the ditch/canal will be protected from eroded sediment during operations and post closure, <br /> prior to the re-establishment of vegetation. <br /> 6.3.4 EXHIBIT D—Reclamation Plan <br /> 10. Site revegetation. Paragraph (c) on p. 3 of the Reclamation Plan references the "reclamation <br /> plans to be utilized on the Lemay Realignment' and was not included in the submittal, which <br /> may or may not address the missing information required by Rule 6.3.4(1)(c). Please specify <br /> the following information: <br /> a) State the thickness of plant growth medium to be replaced. <br /> b) Explain how the seedbed will be prepared to eliminate compacted conditions (e.g., <br /> plowed, chiseled, disced). <br /> c) State the grass, forb, shrub and tree species to be planted and the applicable quantities. <br /> Specify the quantity of each grass and forb species as pounds of pure live seed per acre. <br /> d) Specify the application method for grass and forb seeding. (Note: if the seed is to be <br /> broadcast, the application rate shall be twice the rate required for seed drilling). <br /> e) If mulch is needed, specify the kind to be used, the crimping method, and rate of <br /> application. <br /> 11. Cost Estimate. Rule 6.3.4(2) requires applications provide an estimate of the actual costs to <br /> reclaim the site based on what it would cost the State of Colorado using an independent <br /> contractor to complete reclamation. The exhibit indicates the use of a Cat 623 scraper and a <br /> D6 dozer, as well as suggesting seedbed preparation, application of soil amendments, seed and <br /> mulch; yet only proposes mobilizing two pieces of equipment. This rule also specifies <br /> including indirect costs. Please provide information on the type of equipment planned for <br /> seedbed preparation, and the application of seed, mulch and soil amendments. (Note: the <br /> reclamation cost estimated by the DRMS will include indirect costs.) <br /> 12. CDI quote. Section 2 on p. 3 of Exhibit D indicates the CDI reclamation is for 8.0 acres. The <br /> application form states the permit area is 8.7 acres and based on your response to Comments 7 <br /> and 8 above, may be much closer to 9 acres. Please explain why only 8 acres are costed for <br /> re-seeding in Section 2. <br /> 13. Dryland Pasture Mix. The "Buffalo Brand Seed" mix provided is vague in that it does not <br /> specify pounds of pure live seed or indicate a specific seed rate or application method as <br /> discussed in Comment 1 Oc and d above. <br /> 6.3.5 EXHIBIT E—Map <br /> 14. Map requirements. Rule 6.2.1(2) requires maps must be prepared and signed by a registered <br /> land surveyor, professional engineer, or other qualified person; and give the date prepared. <br /> The two maps submitted in Exhibit E are not signed and the date is too small to read. The <br /> resubmitted maps must be signed by the engineer, surveyor or other qualified person that <br /> prepared them and the date must be legible. <br /> 15. Map information. Exhibit E maps must include the following: <br />