Laserfiche WebLink
HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly 2,110.5 LCY/hr <br /> production: <br /> Materials consistency Compacted fill or embankment 0.9 <br /> description: <br /> Average push 15% <br /> gradient: <br /> Average site altitude: 5,400 feet <br /> Material weight: 2,650 lbs/LCY <br /> Weight description: Decomposed rock-25%Rock,75%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 1.000 (DOZ-OC) <br /> Push gradient: 0.666 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.868 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.3239 <br /> Adjusted unit 683.59 LCY/hr <br /> production: <br /> Adjusted fleet 683.59 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: I Dozer(s) <br /> Unit cost: $0.503/LCY <br /> Total job time: 2.60 Hours <br /> Total job cost: $893 <br />