Laserfiche WebLink
BULLDOZER WORK <br /> Task description: Regrade Pond SBP1 <br /> Site: Williams Fork Mines Permit Action: 2020 Reclamation Left Permit/Job#: C1981044 <br /> PROJECT IDENTIFICATION <br /> Task#: 035 State: Colorado Abbreviation: None <br /> Date: 12/16/2020 County: Moffat Filename: 007 <br /> User: DC1 <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D9T-9SU <br /> Horsepower: 405 <br /> Blade Type: Semi-Universal <br /> Attachment: 1-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $156.88 NA <br /> Operating Cost/Hour: $127.87 100 <br /> Ripper own. $17.90 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $343.94 <br /> Total Fleet Cost/Hour: $343.94 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 1,578 <br /> Swell factor: 1.125 <br /> Loose volume: 1,775 LCY <br /> Source of estimated volume: Operator Estimate <br /> Source of estimated swell Cat Handbook <br /> factor: <br />