Laserfiche WebLink
IMC-1 Quarry <br /> Final grading: D8 or equiv., 6 hrs @$100.00/hr. 600. <br /> Seedbed prep: D8 w/ripper, 3 hrs @$100.00/hr. 300. <br /> Seeding: 1.3 ac @ $1,000/ac. (+30%for reseeding) 1690. <br /> PMD-5 Dump <br /> Finish grading and seedbed prep: D8 or equiv.,w/ripper, 2 hrs @ $100.00/hr. 200. <br /> Seeding: 1.0 ac @ $1,000/ac. (+30%for reseeding) 1300. <br /> MQED-4(East Dump) <br /> Slope reduction: D8 or equiv., 1,400 CY @ $1.00/CY. 1400. <br /> Finish grading: D8,4 hrs @ $100.00/hr. 400. <br /> Seedbed prep: D8 w/ripper, 3 hrs @ $100.00/hr. 300. <br /> Seeding:4.0 ac @ $1,000/ac. (+30%for reseeding) 5200. <br /> MQD-1 Dump <br /> Slope reduction grading: D8 or equiv., 2,800 CY @ $1.00/CY. 2800. <br /> Finish grading: D8, 6 hrs @ $100.00/hr. 600. <br /> Haul growth medium: Cat 830 loader and 12-CY dump truck, 1,000 CY @ $1.50/CY. 1500. <br /> Spread growth medium: D8 or equiv., 6 hrs @ $100.00/hr. 600. <br /> Seed bed prep: D8 w/ripper,4 hrs @ $100.00/hr. 400. <br /> Seeding: 6.0 ac @$1,000/ac. (+30%for reseeding) 7800. <br /> Noxious Weed Control—monitor all affected areas,treat where needed, 2x 1000. <br /> Mobilize/demobilize Equipment: D8, Cat 830 Loader, 12-yd Truck, Seeding Eqpt. <br /> Haul from Canon City, 1 hr each way, 20 miles 2000. <br /> Subtotal: Direct Reclamation Costs (above) 66,325. <br /> DRMS Indirect Costs: Contractor O/P+Contract Admin., etc. = 20%of Direct Costs 13,265. <br /> Total Direct and Indirect Costs(Estimated Financial Warranty Amount) $79,590. <br /> -------------- <br /> -------------- <br />