My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-02_REVISION - M1977144
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977144
>
2021-03-02_REVISION - M1977144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 7:02:19 AM
Creation date
3/3/2021 7:00:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977144
IBM Index Class Name
REVISION
Doc Date
3/2/2021
Doc Name
Request for Technical Revision
From
Colorado Quarries, Inc.
To
DRMS
Type & Sequence
TR1
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mica Lode, Permit M-1977-144,Technical Revision <br /> Exhibit L-Reclamation Costs <br /> The figures below are taken from the individual task details described in Exhibit E. <br /> Reclamation Costs and Estimated Financial Warranty Amount <br /> Affected Area <br /> Reclamation Tasks: Quantities x Unit Costs Task Cost <br /> Ruby Pit <br /> Slope grading: D8 dozer or equivalent on 4.0 acres of slopes, 16 hours @ $100.00/hr. 1600. <br /> Pit floor grading(if pit is not a pond): D8 or equiv.on 1.0 ac.floor, 3 hrs @ $100.00/hr. 300. <br /> Seedbed prep: spread growth medium & rip, D8 or equiv., 6 hrs @ $100.00/hr. 600. <br /> Placement of oversize material in pit: Cat 830 loader or equiv., 150 CY @ $2.50/CY. 375. <br /> Seeding(all areas): 5.0 acres @ $1,000/ac. (+ 30%for reseeding) 6500. <br /> IMC-2 Quarry <br /> Slope reduction: blasting and grading with D8 or equiv.,4,000 CY @ $1.00/CY. 4000. <br /> Slope finish grading:4 hrs @ $100.00/hr. 400. <br /> Pit floor grading: 2 hrs @ $100.00/hr. 200. <br /> Seedbed prep: spread medium and rip, D8 or equiv.w/ripper, 3 hrs @ $100.00/hr. 300. <br /> Seeding(all areas): 2.5 acres @ $1,000/ac. (+ 30%for reseeding) 3250. <br /> IMC-3 Quarry <br /> Haul backfill material: Cat 830 loader, 12-yd dump truck, 6 hrs @ $150/hr. 900. <br /> Spread material: D8 or equiv., 2 hrs @ $100.00/hr. 200. <br /> Finish grading and seedbed prep: D8 or equiv.w/ripper,4 hrs @ $100.00/hr. 400. <br /> Seeding: 1.0 ac @ $1,000/ac. (+30%for reseeding) 1300. <br /> MQD-1 Dump (West Dump) <br /> Slope reduction: D8 or equiv., 3,500 CY @ $1.00/CY. 3500. <br /> Haul growth medium: Cat 830 loader, 12-CY dump truck, 1,000 CY @ $1.50/CY. 1500. <br /> Spread growth medium: D8 or equiv., 6 hrs @ $100.00/hr. 600. <br /> Finish grading: D8 or equiv., 8 hrs @$100.00/hr. 800. <br /> Seedbed prep: D8 w/ripper, 6 hrs @ $100.00/hr. 600. <br /> Seeding: 6.0 ac @ $1,000/ac. (+30%for reseeding) 7800. <br /> MQHW-1 (West Highwall) <br /> Slope reduction by drilling and blasting: 2,000 CY @ $2.00/CY. 4000. <br /> Pushing and rough grading shot rock: 1,000 CY @ $1.00/CY. 1000. <br /> Placing and spreading waste rock and fines on benches: 1,000 CY @ $1.00/CY 1000. <br /> Seeding benches and unmined margins: 2.1 ac @ $1,000/ac. (+30%for reseeding) 2730. <br /> MQEW-1 (East Highwall) <br /> Slope reduction by drilling and blasting: 1,700 CY @ $2.00/CY. 3400. <br /> Pushing and rough grading shot rock: 1,000 CY @ $1.00/CY. 1000. <br /> Placing and spreading waste rock and fines on benches: 1,000 CY @ $1.00/CY 1000. <br /> Seeding benches, slope, and margins: 1.6 ac @ $1,000/ac. (+30%for reseeding) 2080. <br />
The URL can be used to link to this page
Your browser does not support the video tag.