Laserfiche WebLink
Exhibit D <br /> (d) There will be no features such as ponds, streams, roads or <br /> buildings remaining on the borrow area after reclamation. <br /> (e) All features have been previously addressed in the <br /> Reclamation Plan. <br /> (2) Cost estimate to reclaim the site. <br /> The point of maximum disturbance to site will be when the <br /> excavation activities are finished. Due to the configuration of <br /> the borrow, reclamation activities would not begin until that <br /> time. <br /> Since the excavation slopes were left at a 3:1 gradient during <br /> the borrow removal process, the remaining reclamation work <br /> would consist of removing the perimeter berms and placing the <br /> topsoil materials over the disturbed areas followed by the <br /> application of the recommended soil amendments, seed and <br /> mulch. <br /> Topsoil placement will occur during borrow. Excess rangeland <br /> topsoil from new Lemay Alignment in Fort Collins will be placed <br /> at an estimate of 16,000 CY, or 1 .2 feet thick additional over the <br /> final borrow. These costs will be charged to the new Lemay <br /> Alignment job. <br /> 1 . Placement of salvaged topsoil: <br /> Quantity = 6,400 cubic yards <br /> Equipment: Self-loading scraper (similar to CAT 623) <br /> Dozer (similar to CAT D6) <br /> Labor: 2 equipment operators and '/2 time foreman <br /> Production rate: 150 cubic yards per hour <br /> Page 2 of 3 <br />