My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-19_PERMIT FILE - M2021013
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021013
>
2021-02-19_PERMIT FILE - M2021013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 7:41:32 AM
Creation date
2/22/2021 7:42:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021013
IBM Index Class Name
Permit File
Doc Date
2/19/2021
Doc Name
Application
From
Ames Construction, Inc.
To
DRMS
Email Name
AME
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D <br /> (d) There will be no features such as ponds, streams, roads or <br /> buildings remaining on the borrow area after reclamation. <br /> (e) All features have been previously addressed in the <br /> Reclamation Plan. <br /> (2) Cost estimate to reclaim the site. <br /> The point of maximum disturbance to site will be when the <br /> excavation activities are finished. Due to the configuration of <br /> the borrow, reclamation activities would not begin until that <br /> time. <br /> Since the excavation slopes were left at a 3:1 gradient during <br /> the borrow removal process, the remaining reclamation work <br /> would consist of removing the perimeter berms and placing the <br /> topsoil materials over the disturbed areas followed by the <br /> application of the recommended soil amendments, seed and <br /> mulch. <br /> Topsoil placement will occur during borrow. Excess rangeland <br /> topsoil from new Lemay Alignment in Fort Collins will be placed <br /> at an estimate of 16,000 CY, or 1 .2 feet thick additional over the <br /> final borrow. These costs will be charged to the new Lemay <br /> Alignment job. <br /> 1 . Placement of salvaged topsoil: <br /> Quantity = 6,400 cubic yards <br /> Equipment: Self-loading scraper (similar to CAT 623) <br /> Dozer (similar to CAT D6) <br /> Labor: 2 equipment operators and '/2 time foreman <br /> Production rate: 150 cubic yards per hour <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.