My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-19_PERMIT FILE - M2021013
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021013
>
2021-02-19_PERMIT FILE - M2021013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 7:41:32 AM
Creation date
2/22/2021 7:42:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021013
IBM Index Class Name
Permit File
Doc Date
2/19/2021
Doc Name
Application
From
Ames Construction, Inc.
To
DRMS
Email Name
AME
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D <br /> Applicant: Ames Construction, Inc. <br /> Name of Site: Hofacker Property Borrow <br /> Date: February 12, 2021 <br /> EXHIBIT D — Reclamation Plan <br /> At the conclusion of the excavation activities, the site will be <br /> reclaimed by grading the excavation slopes to a final gradient and the <br /> excavation bottom to a uniform level. The vegetative growth support <br /> material, temporarily stored in the perimeter berms, will be placed on the <br /> excavation slopes and bottom. The constructed access road will be <br /> removed and its' disturbed area included in the reclamation activities — <br /> unless the property owner requests it be left for his future use. <br /> A detailed description of the Reclamation Plan is as follows: <br /> (1) <br /> (a) Overburden replacement <br /> There is no overburden to salvage and/or replace at this <br /> operation. <br /> (b) Reclaimed slope gradient <br /> The reclaimed slopes will be constructed to a 3:1 <br /> gradient.The floor of the excavation will maintain a 1% slope n <br /> from historic north to south <br /> (c) Revegetation measures to reclaim the site. <br /> Ames will be utilizing CDI to seed and we will have them <br /> follow the reclamation plans to be utilized on the Lemay <br /> Realignment. <br /> Prior to the placement and incorporation of the soil <br /> amendments, the perimeter berm will be removed and the <br /> berm material (vegetative support materials) will be <br /> spread over the borrow slopes, bottom and site roadway <br /> The revegetation measures would be performed in the fall <br /> of 2021 . <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.