My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-19_REVISION - M1980131 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980131
>
2021-02-19_REVISION - M1980131 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:14 PM
Creation date
2/22/2021 7:42:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980131
IBM Index Class Name
Revision
Doc Date
2/19/2021
Doc Name
Adequacy Review Response
From
Greg Lewicki & Associates
To
DRMS
Type & Sequence
TR4
Email Name
RAR
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
below the active pit floor that outlet to the Yamp River. An approved Colorado Department of <br /> Public Health and Environment discharge permit covers the site dewatering. <br /> 3. Active Mining Area <br /> Roughly 50 acres of disturbance area will be active at any given time. This is the basis of the <br /> bond scenario outlined in Exhibit L. Contempouraneous reclamation will maintain this <br /> disturbance limit. <br /> 4. Mining Timetable <br /> The following timetable is a best estimate of the sequence of operations for the life of the mine <br /> based on mining and selling 200,000 tons of total product per year: <br /> Table D-1 Mining Timetable <br /> Description Time <br /> Reclaim final pit and processing area 2 years <br /> The mining schedule is planned to minimize disturbance by reclaiming areas as additional <br /> mining is undertaken.Note: If large contracts are awarded to the site,production could increase <br /> to the permit maximum,thereby curtailing the life of the pit. On the other hand, if contracts are <br /> less than anticipated,the life of the pit could be extended. This table is based on a reasonable <br /> projection of average production rates. <br /> 5. Products to be Mined <br /> The Bunn Ranch pit will mine sand and gravel for the production of construction materials <br /> products including, but not limited to: <br /> • Hot mix asphalt <br /> • Readymix concrete <br /> • Washed rock <br /> • Crushed rock <br /> • Pit run <br /> • Construction fill <br /> Bunn Ranch Pit <br /> January 2021 D-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.