Laserfiche WebLink
Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />2.00 <br />1.91 <br />CONTINGENCY: 0.00 <br />Total= $1,232,434 <br />$1,176,974 <br />Total = $0 <br />TOTAL INDIRECT COST = $9,968,037 <br />TOTAL BOND AMOUNT (direct + indirect) = $64,031,107 <br />