My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-12_REVISION - M1986015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986015
>
2021-02-12_REVISION - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:48:59 AM
Creation date
2/17/2021 6:15:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
REVISION
Doc Date
2/12/2021
Doc Name
Adequacy Review Response
From
Castle Aggregate
To
DRMS
Type & Sequence
AM5
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 52. Please verify the equipment listed in the spreadsheets is all the equipment that <br /> will be used for reclamation at the site. <br /> • ➢ Response: The listed equipment is the anticipated operating items needed to <br /> complete the work onsite. It may vary from our spreadsheet depending on the <br /> contractor chosen to complete the work. The slurry wall would be completed by <br /> contract vs. self performance. That equipment is not listed here. The <br /> spreadsheets would be complete for a typical construction company to complete <br /> the 3:1 slopes, regrade the existing areas, and backfill phase 7. <br /> EXHIBIT S—Permanent Man-Made Structures (Rule 6.4.19) <br /> • 53. Pursuant to Rule 6.4.3(g),please show on a map the owner's name, type of <br /> structures, and location of all significant, valuable, and permanent man-made <br /> structures contained on the area of affected land and within two hundred(200)feet <br /> of the affected land. The Division needs this information to verify that all structures <br /> are accurately accounted for and the 24 agreements that were sent out are <br /> sufficient. Note: all maps must meet the requirements specified in Rule 6.2.1(2). <br /> ➢ Response: <br /> ✓ The structure and the owner's name have been added to Map F-1. <br /> ✓ Please see the response to item#6 above for a list of structures. <br /> Operator Provided Tab W—Appendix B Offsite Drainage Channel Design Calculations <br /> • 54. It is unclear why the Offsite Drainage Channel Design Calculations were <br /> included as part of this amendment. If the channel is part of the reclamation,please <br /> clearly show on the Reclamation Plan Map where this structure is going to be built <br /> and provide a summary on why it is needed. <br /> ➢ Response: Three offsite drainage channels move water from the north along <br /> Highway 50 back to the Arkansas River south of the Pueblo East pits. One <br /> channel flows from north to south between Phase 1 and 2. The second channel <br /> flows north to south between phases 1 and 7. These channels will remain as part <br /> of the amended plan and will be required to maintain the offsite water flows not <br /> flowing into the pits. <br /> ➢ The third Channel diverts water around Phase 7 and will be eliminated at the end <br /> of regrading Phase 7. <br /> 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.