Laserfiche WebLink
• 49. Please update the cost summary table, as it does not accurately reflect the Phase <br /> 7 Reclamation costs provided earlier. <br /> ➢ Response: Cost summary has been updated <br /> Total Cost of reclamation for the Water Stora e option <br /> Mobilization $ 20,000 <br /> Concrete Overflow Structures $ 6,400 <br /> Phase 1 $ 2,866,125 <br /> Phase 2 $ 108,861 <br /> Phase 7 $ 606,294 <br /> Total Reclamation Costs $ $3,607,680 <br /> • 50. Please provide the details for the concrete overflow structures listed in the cost <br /> summary table. <br /> Response: Concrete overflow structures will be designed later in accordance with <br /> the anticipated water storage and parameters of the 100 year flood plain. <br /> • 51. Please update the cost summary table with any new cost estimate totals. <br /> ➢ Response: Cost summary table has been corrected. <br /> Total Cost of reclamation for the Water Stora e option <br /> Mobilization $ 20,000 <br /> Concrete Overflow Structures $ 6,400 <br /> Phase 1 $ 2,866,125 <br /> Phase 2 $ 108,861 <br /> Phase 7 $ 606,294 <br /> Total Reclamation Costs $ $3,607,680 <br /> 28 <br />