S. Estimate of reclamation costs (6.3.4.(2): <br /> a. Point of maximum disturbance:This point is estimated to be approximately 2 years after <br /> initiation of site operations. The disturbance at this point (all dimensions in feet)will <br /> include fencing, access road (25 by 550), loading/storage area (100 x 200),work area <br /> (plant site) (200 x 200), soil stockpiles (2 each 400 x 8 along access road, 1 each 450 x 20 <br /> on west side), (2.0 acres without soil and 0.3 acres with undisturbed soil) and actual <br /> excavation area of approximately 3 acres: 1.5 acres mined the first year(to produce <br /> about 47,000 tons)and 1.5 acres stripped for the next year's mining.Therefore, <br /> maximum total acres is 5.3 acres of which 5.0 needs soil and 0.3 does not need soil but <br /> will need to be ripped. (Note: this assumes a 7-year life as described in mining plan, <br /> Exhibit C. Peak cost would be less with a 10-year life.) <br /> b. Unit and total costs: <br /> Action (incl. Labor) Unit cost Quantity Units Total Cost Notes <br /> Backfill and grade $0.60 3650 CY $2,190 <br /> Grade to finish $240 5.3 Acre $1,272 Incl. ripping <br /> Apply soil $3.50 540 CY $1,890 Incl.discing <br /> Seed, etc. $1200 5 Acre $6,000 Incl. mulch,fertilizers <br /> Mobilization $1000 1 L.S. $1,000 Pagosa Springs <br /> Total -- -- -- $12,352 2022 dollars <br /> Mark-up (18.5%) -- -- -- $2,285 <br /> DRMS costs(5%) -- -- -- $618 <br /> Grand total -- -- -- $15,255 IFinancial Warranty Est. <br /> These are based on calculations using recent DRMS estimates for similar work and <br /> assuming 2% per Annum inflation. <br /> Toner Ranch Pit 110c Application Exhibits Page 11 of 20 <br />