Laserfiche WebLink
Current <br /> WRL Lift <br /> Safety and <br /> Stormwater Berm <br /> 50 feet <br /> \� Future Final <br /> - ? - —: • WRL slope Overall Final Slope: <br /> -Upper wedge pushed down to lower wedge by dozer <br /> -2.2H:1 V <br /> -Capped with—12"coarse blasted rock <br /> -On contour single shank ripping,every 10 vertical feet <br /> -Native seedmix <br /> -Native tree tubelings <br /> Upper Wedge <br /> Single shank <br /> ripping <br /> Lower Wedge <br /> 50 feet <br /> *Half wheel height of largest piece of equipment <br /> Figure 5. Schematic cross section of the WRL construction and reclamation designs. <br /> Young Ranch Resource Greg Lewicki and Associates.FLLC <br /> February 2020 D-12 <br />