My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-01-26_INSPECTION - M2008076
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2008076
>
2021-01-26_INSPECTION - M2008076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:40:08 AM
Creation date
2/8/2021 8:26:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008076
IBM Index Class Name
Inspection
Doc Date
1/26/2021
Doc Name
Inspection Report
From
DRMS
To
Robinson Sons Gravel Pit No.1
Email Name
DC1
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br /> Scraper Loading Time: 1.00 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude: 7000 feet <br /> Scraper Push Dozer Source <br /> Altitude Adj: 1.000 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.830 0.830 <br /> Travel Time: <br /> Road Condition: Firm, smooth,rolling, dirt/It. surfaced,watered,maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res(%) Total Res(%) Velocity(fpm) Travel Time(min) <br /> (%) <br /> 1 700.00 0.00 3.00 3.00 2800 0.46 <br /> Haul Time: 0.46 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res(%) Total Res(%) Velocity(fpm) Travel Time <br /> (%) (min) <br /> 1 700.00 0.00 3.00 3.00 2949 0.38 <br /> Return Time: 0.38 minutes <br /> Total Scraper team cycle time: 2.44 minutes <br /> Adjusted for job conditions: I,183.77 LCY/Hour <br /> Selected Number of Scrapers: 2 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 1,183.77 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 19183.77 LCY/Hour <br /> Unadjusted unit production/hour: 1,426.23 LCY/Hour <br /> Optimal Number of Scrapers per push dozer: <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 9.99 Hours <br /> Unit cost: $1.053 /LCY Total job cost: $12,463 <br />
The URL can be used to link to this page
Your browser does not support the video tag.