Laserfiche WebLink
SCRAPER TEAM WORK <br /> Task description: Spread topsoil over Area 1 <br /> Robinson Sons Gravel Pit No. Permit Action: <br /> Site: 1 2021 Cost Permit/Job#: M2008076 <br /> PROJECT IDENTIFICATION <br /> Task#: 006 State: Colorado Abbreviation: None <br /> Date: 1/22/2021 County: Las Animas Filename: M076-006 <br /> User: DC 1 <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/push-pull <br /> -Dozer: Cat D9T-9SU <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: CAT 12M <br /> -Water Truck: Water Tanker, 5,000 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 50 NA NA 25 <br /> Ownership cost/hour: $181.30 $156.88 NA NA $34.52 $29. <br /> Operating cost/hour: $203.87 $63.93 NA NA $8.87 $14. <br /> %Utilization-ripper: NA 0 NA NA NA � <br /> Ripper own. cost/hour: NA $15.59 NA NA $0.00 $0. <br /> Ripper op. cost/hour: NA $0.00 NA NA $0.00 $0. <br /> Operator cost/hour: $30.90 $41.30 NA NA $28.56 $21. <br /> Unit Subtotals: $416.07 $277.70 NA NA $71.94 $65. <br /> Number of Units: 2 1 0 0 1 <br /> Group Subtotals: Work: $11109.84 Support: $0.00 Maint: $137.12 <br /> Total work team cost/hour: $1,246.96 <br /> MATERIAL QUANTITIES <br /> Initial volume: 11,831 CCY Swell factor: 1.000 <br /> Loose volume: 119831 LCY <br /> Source of estimated volume: 8"over 11 acres <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 1,600 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Top Soil Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 51.00 LCY Adjusted Capacity: 29.00 LCY <br />