My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-03_REVISION - M2020008 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2020008
>
2021-02-03_REVISION - M2020008 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 7:00:36 AM
Creation date
2/4/2021 8:36:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020008
IBM Index Class Name
Revision
Doc Date
2/3/2021
Doc Name Note
Part 1 of 2
Doc Name
Request For Amendment To Permit
From
Scott Contracting
To
DRMS
Type & Sequence
AM1
Email Name
LJW
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rifle Gravel Pit #1 January 2021 (Amendment to File No. M-2020-008) <br /> Table 1. Estimated Mining Timetable <br /> Estimated <br /> of <br /> Phase/Stage Anticipated Estimated Duration Depth/Thickness Type d <br /> Start feet ' Overburden <br /> Clay and silt; about <br /> Phase 1 Site 6" of topsoil, <br /> April—May 2021 Estimated 6 <br /> Development and April 2021 medium stiff, <br /> Grading (1-2 months) across site slightly moist, <br /> brown <br /> No additional <br /> Phase 2 Mining May 2021 May—August 2020 overburden will be <br /> Preparation (2-4 months) removed during this <br /> phase <br /> Phase 3 Mining July 2021 July 2021—December 2028 17 feet— 22 feet Varies <br /> Extraction 7 ears <br /> See Boring 3. <br /> Remove estimated <br /> 5.5 feet to 6 feet of <br /> Phase 3/Stage 1 July 2021 July 2021 —July 2022 20 feet clay and silt; gravel <br /> layer estimated at 7 <br /> feet to 27 feet <br /> below surface. <br /> See Boring 4. <br /> Remove estimated <br /> 6" of clay and silt; <br /> Phase 3/Stage 2 July 2022 July 2022—July 2023 21 feet gravel layer <br /> estimated at 1 foot <br /> to 22 feet below <br /> surface. <br /> See Boring 5. <br /> Remove estimated <br /> 2.5 to 3 feet of clay <br /> Phase 3/Stage 3 July 2023 July 2023—July 2024 22 feet and silt; gravel <br /> layer estimated at 3 <br /> feet to 25 feet <br /> below surface. <br /> See Boring 5. <br /> Remove estimated <br /> 2.5 to 3 feet of clay <br /> Phase 3/Stage 4 July 2024 July 2024—July 2025 22 feet and silt; gravel <br /> layer estimated at 3 <br /> feet to 25 feet <br /> below surface. <br /> See Boring 1. <br /> Remove estimated <br /> 2.5 to 3 feet of clay <br /> Phase 3/Stage 5 July 2025 July 2025—July 2027 17 feet and silt; gravel <br /> layer estimated at 3 <br /> feet to 20 feet <br /> below surface. <br /> Phase 4 July 2027 July 2027— December 2028 Not Applicable Not Applicable <br /> Reclamation <br /> The depths and thicknesses are estimated and based upon the nearest exploratory boring <br /> logs included in Attachment C. <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.