Laserfiche WebLink
Rifle Gravel Pit #1 January 2021 (Amendment to File No. M-2020-008) <br /> be conducted at night, but lighting will be kept to a minimum and directed inward; the site <br /> will not have ambient lighting. <br /> 5.2.4 Reclamation (Phase 4) <br /> The reclamation of the property will be completed as per the phasing plan and restored back <br /> to natural conditions as soon as practicable. See Section 6 for additional information <br /> regarding reclamation of the property and Attachment A drawings (Sheet C7). <br /> 5.3 Mining Timetable <br /> SCI anticipates extracting approximately 3 million tons of sand and gravel over 5 to 7 years. <br /> Sand and gravel are the anticipated primary and secondary commodities to be mined and <br /> extracted from this property and used for future projects. There are no incidental materials <br /> expected to be extracted from this site. <br /> The following table provides a range of the duration of mining by phase/stage, estimated <br /> nature, depth and thickness of the deposit to be mined and type of overburden to be <br /> removed. Figure 9 depicts the size, location and area of each phase/stage. Attachment C <br /> includes the exploratory boring logs and material information. <br /> 21 <br />